For general contractors
Painting and drywall packages, built from the drawings and the spec, delivered on time, with the paperwork a subcontract needs. We help you catch problems before they reach the field.
What we need to bid
- Architectural drawings, with the finish schedule
- Specification, Division 09 at minimum
- Addenda issued to date
- Bid date and time
- Scope of work or trade package description
- Insurance requirements, if they differ from standard
If the finish schedule is not in the set, tell us. We will bid without it and note that in writing.
What you get back with a bid
- A lump sum, and unit prices for the items most likely to move
- A written scope of work, with every sheet and keynote it was based on
- Stated assumptions, so every change is priced before the work happens
- Exclusions by name, not by omission
- Conflicts between drawings and spec, named by sheet, with how we read them
- The prep we planned for existing conditions, and other options if conditions differ
- Addenda acknowledged by number
- Alternates where the specification allows one
- Product data, color and sheen submittals ready with the bid
Bid turnaround
- Standard
- 5 business days from receipt of a complete set
- Incomplete set
- Quoted on request. We list the missing sheets first.
Try us on one package
Every sub on your list started as a name you hadn't used. Send us one package, a small one if you like. You get a written scope, stated assumptions and a complete bid on time. Judge us on that.
How we bid
We read the specification, not just the drawings.
Division 09 governs coats, prep and warranty. A drawing shows where the paint goes. The spec decides how the job gets done.
We write the scope down first.
Every bid ships with a written scope, stated assumptions and unit prices.
We flag conflicts before bid.
When the drawings and the spec don't match, we name the sheet and keynote and tell you how we read it, so nothing surprises you later.
We look at existing conditions first.
Existing conditions are where jobs go wrong. We look at them first, tell you what we found, and recommend the best way to handle them.
On the job
One person accountable for the package.
A named point of contact from award through closeout. Submittals, RFIs, change pricing and punch go through the same person.
Labor placed against the schedule.
Occupied stores, phased turnovers and night or weekend work are planned up front.
Mockups before production.
Brush-outs, sheen and finish-level mockups submitted and approved before production coating. Gypsum finish level checked before the first finish coat.
A clean closeout.
Daily cleanup and protection of adjacent finishes are carried in the scope. At completion: punch walked with the superintendent, touch-up, attic stock delivered, warranty and product data submitted.

Insurance and bonding
General liability and workers compensation are in force. Certificates are issued per project through our carrier, naming the general contractor and owner as the subcontract requires. Send the insurance requirements with the invitation and we confirm compliance before award.
Carrier names and policy limits are on the certificate, not this page, because they change at renewal.
- General liability
- In force. Limits confirmed on the certificate issued for your project.
- Workers compensation
- In force, statutory.
- Additional insured
- Available on request.
- Waiver of subrogation
- Available on request.
- Bonding
- Discussed per project. Send bonding requirements with the invitation.
- W-9
- Issued on request.
Company
- Legal name
- MetroBuilding Services LLC
- Trade
- Commercial painting and drywall subcontractor
- Service area
- New York, New Jersey, Pennsylvania, Connecticut
- Estimating
- estimates@metrobuildingservices.net, 646-543-2208
- On site
- Daily cleanup is carried in the scope.
- Materials
- We supply materials on our packages. Specified products are sourced to whatever the specification names.
Trade codes
- 09 90 00
- Painting and Coating
- 09 91 00
- Painting
- 09 96 00
- High-Performance Coatings
- 09 20 00
- Plaster and Gypsum Board
- 09 29 00
- Gypsum Board
Send the package.
Drawings, specification, addenda and the bid date.